Search
Two well-kept traditional homes on adjoining tree-lined Ann Arbor lots, with muted autumn lawns and mostly bare maple branches.

Ann Arbor Adopted Its Triplex Plan in March. The Zoning That Governs Your Next Home Is Still the Old Code.

"We have not yet adopted the zoning standards intended to implement the transition designation, and that's the central problem with this proposal." Council Member Jen Eyer said that at the October 19 Ann Arbor City Council meeting, according to The Ann Arbor News on MLive. Council then defeated a request to rezone 41 acres for 342 new apartments.

The Comprehensive Land Use Plan adopted in March describes what Ann Arbor wants to become by about 2050. On October 19 the council defeated a proposal to rezone Woodbury Gardens ahead of the zoning rewrite.

The 41-acre test case

Woodbury Gardens is an established apartment community off East Stadium Boulevard and South Industrial Highway. Its owner, the Birmingham-based Bleznak real estate group, asked the city to rezone the entire 41-acre site to TC1, the city's existing transit corridor district, with conditions limiting heights to between 35 and 120 feet depending on distance from nearby homes. The proposal paired the rezoning with three new seven-story apartment buildings. It would have demolished 33 existing apartments and built 342 new units: 72 studios, 165 one-bedrooms, 79 two-bedrooms and 26 townhouses.

The proposal passed first reading 10-1 in September. At final reading on October 19 no council member spoke in support, and it was defeated without a roll call vote. The city's legislative record shows the outcome.

Council members said they appreciated the effort behind the proposal and the conditions the developer offered. Eyer noted that the new plan does envision more density in transition areas like this one, but that it does not designate them TC1. Applying an old district to a site it wasn't built for would have set the rules for the whole 41 acres, even though only part of the site was slated for redevelopment soon. Council Member Jon Mallek called the result "a bit of a zoning Frankenstein." He said TC1 was meant to replace surface parking lots with housing, not to replace existing housing.

What each plan category points toward

City Council adopted the Comprehensive Land Use Plan 11-0 on March 16, 2026. The city's own announcement states plainly that adoption "does not immediately change zoning or development regulations." Here is what the adopted plan describes for its three main housing categories.

Plan category What the plan describes Height in the plan Areas the plan names
Residential "Single family, Duplexes, and Triplexes are permitted by right," plus cottage courts, stacked flats and, where depth and access allow, townhouses "Buildings up to 3 stories" Established neighborhoods citywide
Transition Attached houses, townhouses, stacked flats and apartments, office, commercial and non-nuisance industrial uses "3 stories to high-rise depending on context," set by distance from Residential South Industrial and North Main
Hub High-density residential, office and commercial around major transit hubs "Large-scale, high-rise," the city's "tallest, most intensive development potential" State/Eisenhower/Briarwood and Plymouth Road

"Permitted by right" in that Residential row is plan language. The same page says that turning the category into zoning "will require thoughtful implementation." It also lists the controls still to be decided: maximum building size, setbacks, building coverage, lot size, number of dwellings, unit counts and bedroom counts.

The map also carries a "Residential or Transition" label for a limited set of areas that the plan says need further study during implementation. If a home you like sits in one of those areas, even the plan's direction for that block is still open.

The calendar between plan and code

The rewrite now has a budget and a schedule:

  • October 5, 2026: Council approved a $786,499 consultant contract for a Unified Development Code rewrite and improvements to development review.
  • November 2026: Anticipated start of the rewrite, according to the city's request for proposals.
  • Spring 2027: Development-review recommendations are due four to six months after the start.
  • November 2028 to November 2029: The 24-to-36-month window for the rewrite and the zoning map update.

The request for proposals describes replacement districts named Hub, Transition and Residential, with residential districts that allow at least triplexes. Each of those districts still has to go through Planning Commission review and a Council vote.

One piece may move sooner. On the same night as the Woodbury vote, according to a separate Ann Arbor News report on MLive, Council voted 9-0 to ask the Planning Commission to recommend extending downtown-style zoning into an area bounded by Main Street, Oxford Road, North University Avenue and Dewey Avenue, south and east of downtown and Central Campus. The resolution as drafted included a 180-day deadline. The version that passed dropped it and asked the commission to gather resident input on boundaries, heights and other conditions first. The resolution also described a height framework for transition areas: low-rise within 300 feet of residential areas, mid-rise beyond 300 feet and high-rise beyond 600 feet.

Where the existing code is still producing housing

New housing keeps coming in the meantime. It comes from sites whose current zoning already allows it.

At 2285 W. Liberty Street, Tareen Development Partners proposed a 12-story, 343-unit affordable apartment building on a site already zoned TC1. The Planning Commission approved the site plan on September 15, 2026. Woodbury asked to be rezoned into TC1 and was refused. West Liberty already had TC1 and moved forward.

Downtown, the Ann Arbor DDA's 2025 State of the Downtown report counts 342 market-rate and 33 affordable units opened by private developers in 2025, its highest total since 2018, and 720 units under construction at year-end. For scale, the plan puts the city's historical average at 520 new units a year citywide. MLive's coverage of the campus-edge vote also showed the 17-story Rambler Ann Arbor high-rise under construction on Church Street on October 5.

The county sales data shows where buyers already have room to negotiate. In the Greater Metropolitan Association of REALTORS® Ann Arbor Area report for August 2026, which covers all of Washtenaw County rather than the city alone, condo new listings rose 33.3% from August 2025. Condo inventory reached 332 active listings, up 45.0%, with 4.8 months of supply, and median days on market climbed 84.8% to 61. The condo median still rose 6.0% to $355,000. Single-family homes were tighter: a $475,000 median, up 2.2%, with 739 active listings and 3.3 months of supply.

So the attached-home segment already offers more choice and more time on market, before any of the plan's new districts exist. A condo buyer who waits for "the plan" to add supply is waiting on a process that may not finish until 2028 or later. The supply that matters this winter comes from current listings and buildings already permitted under the current code.

Ann Arbor's zoning and future land use maps

The city publishes a current zoning map and a future land use layer separately.

  1. The city's interactive zoning map shows current zoning and planning overlays.
  2. The approved Future Land Use layer is published as its own dataset, updated November 1, 2026. The map on the city's engagement site is still labeled "Draft."

This is general information about public planning documents, not legal, tax or financial advice. Confirm what applies to a specific property with the City of Ann Arbor planning staff, a real estate attorney or your lender before relying on it.

If you are comparing Ann Arbor homes, Kamran Boushehri can work with you in English or Farsi. Schedule a consultation.

Elevating the Art of Real Estate

Experience real estate at the highest standard with Kamran. Combining expertise, discretion, and market insight, he ensures every transaction reflects excellence. With Kamran, your success is always the signature outcome.

Follow Kamran on Instagram